grey   logo

Tel: 0113 245 7170
Fax: 0113 236 4010
Email:

  grey
       
spacer
 
Navigation   Saftronics   News
spacer

>

  Saftronics

About Us

Capabilities
Quality and Standards
>   Products

Motor Control Centres

 

- Intelligent Design

 

- Withdrawable Design

Sivacon Switchgear

Switchboards

Control Panels

Control & Automation

Saf Source
Solution Partners
Site Services / Training
Download Brochures
>   Product Standards

BS EN 60439-1

Forms of Separation
>   Customers/Experience

Industries

Case Studies
>   Contact Details
Contact Us/Location
Careers at Saftronics
trade and insustry
 
 

...Case Studies

line   saftronics   saftronics industry  

Links

• Church Wilne
• Canary Wharf

Project: Church Wilne WTW
End Client: Severn Trent Water
Industry: Water and Waste Treatment

Church Wilne WTW is a major water treatment works located in the peak district national park. This site treats approximately 120MLD of water, which is fed into the Derwent Valley Aqua duct.

In 2003 Saftronics were asked to implement a new GAC plant on this site. This involved the supply of 9 SLC 5/04 PLCs to control the GAC plant. The plant was also equipped with a new RSView32 SCADA system to provide a high functionality operator interface.

church wilne

In order to allow the new plant status information to be displayed on the site SCADA system we also extended on of the existing DataHighway+ networks on the site to incorporate the new PLCs.

In 2004 Saftronics were asked to provide plant control systems for the Kalic and Acid plants on this site. This involved adding 2 further SLC5/04 PLCs onto an Existing DataHighway+ network each fitted with a Mitsubishi HMI.

In late 2004 Saftronics were asked to review the old GAC plant on this site because the control system was unreliable and provided a poor operator interface.  After we concluded our review we were asked to re-write the PLC code and provide a better HMI. Saftronics implements a full PLC re-write, installed an RSView32 SCADA HMI and implemented an improved interface to the site SCADA system.

In late 2005 Saftronics were asked to assist with numerous signal information provision improvements for the site. This involves the installation of 4 new SLC5/04 PLCs. Saftronics also provided a technical solution to the slow site SCADA system performance by proposing a state-of-the-art communications hub into the main control room thus eliminating all data bottlenecks on the site networks.

Saftronics have now supplied or amended over 70% of the PLCs on this site and as a result of our efforts made significant improvements to the plant control.

 

 

Heathrow - 'T5'
heathrow
Saftronics have recently delivered the last of the 18 L.V. Switchboards
click here for more