Saftronics Assist a Fellow SIEMENS SIVACON Technology Partner
Siemens Electrium UK got in touch with a request as their usual contractor could not achieve the client’s requested installation dates. The scope was to install three SIVACON S4 low voltage distribution boards that had been manufactured for a newly built AMAZON distribution logistics hub at East Midlands airport The